Coaches of Delhi Metro yellow line manufactured by Mitsubishi-ROTEM.
2002 CE–2023 CE (historical) Historical

The Delhi Metro Opens Its First Line

Construction of the Delhi Metro began in 1998, and its first elevated stretch, Shahdara to Tis Hazari, opened on 25 December 2002. Run by the Delhi Metro Rail Corporation, it grew into India's largest metro, with ten lines and 271 stations, and earned carbon credits from the UN.

Work on the Delhi Metro started in 1998, and on 25 December 2002 the first elevated section of the Red Line, between Shahdara and Tis Hazari, was opened to passengers. An underground stretch of the Yellow Line, linking Vishwavidyalaya with Kashmere Gate, followed on 20 December 2004. The network grew in phases: the first was finished by 2006, the second by 2011, the third mostly by 2021 apart from a short Airport Line extension opened in 2023, and the fourth began in December 2019. It is built and run by the Delhi Metro Rail Corporation, a joint venture of the central and Delhi governments. Today it has ten colour-coded lines and 271 stations over roughly 374 kilometres, mixing underground, ground-level and elevated stations, and it serves Delhi along with Noida, Gurugram, Faridabad, Ghaziabad and other neighbouring towns. It ranks as the biggest and most heavily used metro in the country. In 2011 the United Nations certified the corporation as the first rail system anywhere to earn carbon credits for cutting emissions, estimated at 630,000 tonnes a year. Its success inspired metro projects in many other Indian cities.

#delhi-metro#urban-transport#dmrc#infrastructure#rapid-transit#delhi

Sources